Electrical Installation Management Software
Manage and track cable installation and connection with smartphone-based data collection, detailed progress data, statistics, transparent reports, and real-time notifications.
project management for electrical installation

One-Click Data
Import, manage, reach and keep up-to-date project data as easy as ABC. Collect recent cable and equipment status with one-click designed app on employee's smartphones.

Cable lists & Reports
Group cables and equipment flexibly based on their data or labels. Prepare different cable lists with barcodes or QR-codes for easy supervision and reporting. Automatically send customizable reports via emails and messengers to track progress and reach milestones.

Transparent data
Transparent project data for customers and supervisors. Let project’s key accounts view data and progress, comment, and approve important steps online to make collaboration seamless and stress-free.

Statistics & Progress
Stay entirely informed about progress on cables, equipment, locations, areas, and projects with statistics, progress estimates, flexible data views, dashboards, charts, and forecasts.

real-time notifications
Small delays in decision-making result in significant delays in the project’s progress. Take timely crucial actions with real-time notifications about important changes that require attention. This minimizes future troubleshooting, and saves money.

Changes management
Change management can be challenging. Stay ahead and empowered to make critical decisions right on time with automatic notifications and a complete history of updates to cable and equipment data.
Clear path to electrical installation project goals
Prepare Project Data
Import cable routing, equipment, and locations data, upload drawings, and prepare QR-coded cable pulling & connection lists, and identification tags based on any specific requirements for easy data acquisition.
- Single source of truth
- Flexible task assignment and planning
- AI-based PDF drawings indexing

Capture, Click, Collect
Transform employees’ smartphones into a powerful and user-friendly electrical installation process data collection tool. Scan QR-codes to update cables or equipment data quickly.
- No additional hardware
- Time-saving one-click-design app
- Up-to-date installation progress

Get Detailed Status
Stay constantly updated with comprehensive status and progress information. Monitor pulled, tested, and connected cables, equipment, and installation work progress at any location or area.
- Real-time progress information
- Areas & locations data
- Status & changes history

Focus on essentials
Figure out progress blockers and bottlenecks with overview dashboards and charts at any location, area, or project overall. Get notified about sinking cable installation or connection speed.
- User-friendly & flexible filtering
- User-defined lists and labels
- Include/exclude from statistics option

Manage effectively
Bad data is costly for projects and companies. Locate issues promptly and take immediate action. Keep customer, key accounts and supervisors informed about progress and milestones.
- External users & approval workflows
- Issues reporting tool
- Changes management & history


Ready to see how cable pilot can transform your business?
Popular Cable Pilot features
Track and manage your electrical installation project without any effort with most wide-featured tool!

co-pilots you through Electrical Installation

At Your Fingertips
All project and routing data, including cable and connection diagrams, is stored online and accessible from any device at any time.
Detailed & User-Friendly
Get all details on any cable, category, equipment, location, or area as deep as you need without losing yourself in the data.
Linked to Drawings
Find the corresponding pages in the linked drawings by single-clicking with breakthrough AI-based cable and equipment indexing.
Pricing plan that suits your needs
SOLE
Perfect for individual professionals and small projects
call for pricing
--
- Single user
- Up to 400 cables in project
- single OnSite user
- Up to 2 projects
- Basic management tools
- Basic reporting tools
- Drawing indexing tool
- Cable Points
- Cable Pilot AI
BUSINESS
Designed for growing businesses needing more capacity
call for pricing
--
- Up to 3 users
- Up to 1500 cables in project
- up to 5 OnSite users
- Up to 5 projects
- Advanced management tools
- Advanced reporting and analytics
- Drawing indexing tool
- Predefined Cable Points
- Cable Pilot AI
ENTERPRISE
Tailored solutions for large-scale operations
call for pricing
--
- Unlimited users
- Unlimited cables in project
- Unlimited OnSite users
- Unlimited projects
- Customizable management tools
- Advanced reporting and analytics
- Integration with PMS & DMS
- Flexible Cable Points
- Cable Pilot AI
Ready to see how cable pilot can transform your business?
Recent Blog
It is Monday morning. The lead engineer has just dropped a 4,000-row Excel file in the coordinator’s inbox, and the column headers read ‘Kab.Nr.’, ‘Von’, ‘Nach’, ‘Typ/Querschnitt’, ‘Länge (m)’. The design office is German. The coordinator is not. There is no mapping guide, no template, no instruction sheet attached — just the file and a […]
The Friday Meeting Nobody Expected to Explain It is Friday afternoon in the weekly site meeting, and the electrical coordinator is presenting progress to the project sponsor. Seventy-eight percent of cables have been pulled. The percentage sits cleanly on the slide, and the sponsor nods. The schedule looks recoverable. Three weeks later, the reality has […]
The Commissioning Readiness Problem The shipyard equipment installation lifecycle reaches its critical test two days before moorings trials. The commissioning manager walks into the site office with one critical question: “Is switchboard SB-47 fully connected and tested?” The installation supervisor checks a spreadsheet last updated on Tuesday. The electrical coordinator picks up a phone and […]
The Scene: 07:45 on Tuesday morning. Fifteen minutes until the weekly progress meeting. The electrical coordinator opens a spreadsheet compiled from yesterday’s contractor reports and finds three different numbers for cables pulled on Deck 4. Two are probably wrong. All three are hours old. She has 900 cables on that deck—ranging from a two-metre signal […]
It is 07:15 on the main deck. An electrician has six cables to pull before the afternoon hatch closure. The supervisor is still at the morning briefing. There is no printed list—the coordinator updated three of those cable routes overnight. So the electrician pulls out a smartphone, opens the Cable Pilot shipyard smartphone app, and […]
The Tuesday morning meeting is a familiar scene on nearly every large shipyard project. The electrical coordinator calls a progress review with the contractor superintendent and poses a straightforward question: how many metres of power cable have actually been pulled on Deck 4 this week? Three people immediately reach for three different spreadsheets. The numbers […]